For three decades, Bilt-Rite Construction has completed hundreds of successful building projects -- residential, historical and municipal -- in the greater Boston area.

An established leader in building affordable housing in Boston, Bilt-Rite Construction specializes in construction management, preconstruction planning, value engineering and general contracting services. 

  

 

 


Roxbury Presbyterian Church

Fast Facts:

Project Name: Roxbury Presbyterian Church
Location: Boston, MA
Owner: Presbyterian Church
Architect: Gail Sullivan Associates
Scope: Extensive interior renovations to a historic stone church building located in Boston.  Work included structural stabilization, new plumbing, HVAC, and electrical systems.  The work to the sanctuary was mostly cosmetic and the lower level involved the complete build-out of expanded community support facilities.

Chris's PROject notes

"Few construction projects culminate in a celebratory service with an entire congregation. But this was no ordinary project, the adaptive reuse of the lower level of a Gothic, Queen Anne style building constructed in 1891.

One that’s on the National Register of Historic Places, no less.

We built a daycare facility that required handicap modifications, the installation of a mechanical lift, and construction of a mechanical room addition at the rear and a complete build-out of the existing space.

Plus, the main sanctuary was restored without sacrificing any of its original details with added lighting, mechanical systems, wall repairs, new wood flooring and painting/staining of the entire space.

Our major construction challenge was to stabilize this historical building structurally and completely upgrade all of its MEP Systems while maintaining its historic character.

Our team worked with the owner’s budget and fundraising schedule to complete the work as the funds became available. The Pastor along with the whole congregation was instrumental in the fundraising effort which continued through the construction period with a lot of trust between us and the owner."